Description
Only 4 Steps
1. Clean and dry the surface
2.Check the cleanliness of the floor
3. Spread the epoxy coating with a trowel
4. Leave to dry for 12-24 hours
Note
-
Due to product upgrades, We will optimize the packaging from time to time.Packaging changes will not affect the core ingredients, Usage effect,and other key functions of the product.
-
New and old packaging will be distributed randomly (subject to the actual product).
Product Image






Reviews
There are no reviews yet.